For all your enquiries call us (09) 525 1494

OUR PROJECTS

rydges1

Rydges Hotel, Auckland CBD I $30m

The demolition of an existing five storey building, which was situated next to the existing hotel, and the construction of a new ten storey hotel, including a roof top function area and restaurant. The structure was reinforced concrete foundations on piles, boxed insitu columns & beams and double tee ?ooring with 75mm concrete topping slab. The existing hotel continued to be operational during construction and therefore communication with both hotel management and contractors was a high priority. The project was completed on budget and ahead of schedule. Upon completion, N. Cole also secured the refurbishment of the existing hotel which was completed late 2013.

orams1

Orams Marine I $7.5m

Construction of industrial units in the hard standing/haul out area in Westhaven, Auckland CBD. Challenging environmental conditions due to the construction on the waters edge and silt control required special consideration and management. The project consisted of multi-storey precast panels with a vehicle ramp for roof top car parking. Using structural steel and precast panels, N. Cole also constructed an 18m high shed to house super yachts. Orams was a highly successful project, completed on time and within budget.

hayes2

Hayes Foundry – Newmarket I $4.5m

A staged refurbishment of an historic industrial foundry in Newmarket into a high-end retail development block. The building required structural upgrades, re-roofing and provisions of new services throughout. The building was a contemporary design and involved significant reconstruction of the existing foundry using structural steel and concrete block in?ll. N. Cole then constructed 24 retail units within the existing envelope.

abbeville2

Abbeville Farm, Akld Airport I $2.5m

A two stage contract with the initial construction works comprising of the re-location of two heritage buildings, the refurbishment of an historic church and the re-roo?ng and re-cladding of an additional two buildings. Stage two was an internal ?t out and services upgrade to the existing buildings.

 

GET IN TOUCH WITH US

Reply:
Please leave this field empty.


Please leave this field empty.

© 2017 Copyright N.Cole Ltd
Website by Austin Digital